Focused on Asia Pacific · Connected to global practice

Data Centre Power Centre · KNOWLEDGE & PROJECT TOOLS

Training pathway

Data Centre Power Centre / Training pathway

This centre supports developers, facility owners, utilities and energy advisers who need to make a power-supply decision.

Topic training and membership

Data centres, VPP, energy storage and heat–power each offer nine lessons in three modules. The three lessons in each first module are free. Modules two and three are included in monthly and annual Intelligence membership, with technical explanations, figures, engineering cases, exercises and worked answers: 24 member lessons across four topics.

The existing price remains US$19.90 monthly or US$199 annually. One subscription includes all four topics; active members do not buy courses separately. Knowledge libraries, technology overviews, existing topic calculators, data checklists and self-service diagnostics remain free.

Member lessons are available during an active subscription. Topic courses are currently in English and Simplified Chinese. Custom project analysis, design review and personal consulting require a separate scope and quotation; they are not included in the subscription.

Account and membership plans →

OBJECTIVES → TASKS → ANSWERS → OUTPUTS

Three modules for project decision skills

All nine lessons are published: module one is free, while modules two and three require membership. Read the concepts, technical mechanisms and engineering cases in sequence, then attempt the exercises. Numerical examples distinguish teaching assumptions from field evidence.

Start the first lesson

References and review date

Reviewed 25 October 2026. Teaching derivations and project methods are original; the following sources provide background and do not replace project-specific requirements.

IEA · Key Questions on Energy and AI (2026) ↗ — Energy demand and evolving AI-related power characteristics; not a project design standard.

IMDA · Green Data Centre Roadmap (2024) ↗ — Singapore policy context; not a capacity allocation or project approval.