Data centre supply option comparison

Make each option answer the same supply question. Check power, energy, replenishment and timing first, then compare lifecycle present costs on an equivalent scope.

CSV and calculations run in this browser; raw CSV is not uploaded. Local drafts are written only when you save, and exclude CSV. An enquiry summary is prefilled only when you choose that action; you still need to submit the form yourself.

1. Define the common decision basis

All options use the same demand, duration and required date. Horizon is 1–50 years and rate 0–100%. Cash flows use constant annual cost, at most one replacement and terminal residual; tax/financing are separate.

2. Enter each option or offer

Item 1: Reinforcement example
Cost and value inputs
Permissions, terms and evidence record

These choices record conditions you have verified. They do not sign a contract or indicate website approval.