Focused on Asia Pacific · Connected to global practice
← Topic toolsPROJECT DECISION APP · 1.0.0

Project data health check

Establish what the data can support before choosing a solution. After reading a CSV, confirm columns, units and interval meaning. The tool retains issue evidence rather than silently filling gaps or choosing duplicate values.

CSV and calculations run in this browser; raw CSV is not uploaded. Local drafts are written only when you save, and exclude CSV. An enquiry summary is prefilled only when you choose that action; you still need to submit the form yourself.

1. Choose or paste a CSV

Use UTF-8 CSV, at most 2 MB, 50,000 records and 100 columns. Comma, semicolon and tab separators are supported. Numeric values use a decimal point; thousands separators, formulas and Excel date serials are not accepted.

Current data: Fictional teaching data

2. Define the data meaning

Use a time such as 2026-01-01T00:15:00+08:00. Use interval starts or ends consistently. No external expected start/end dates are supplied, so coverage does not detect missing data before or after the file.

Related tools and learning

Background references are the primary sources linked in the topic curriculum and guide. Methods here are transparent data, power, energy and present-value derivations; examples are not equipment quotations, tariffs or market returns.